I spent most of the day pouring over the VW factory wiring diagrams trying to figure out what the heck had happened, previously, to the poor VW's wiring. It had been patched, chopped, and re-connected many, many times. More than one "shade-tree-mechanic" had his hand in the wiring.
I call it: "Explosion In The Spaghetti Factory."
(I have most of it figured out. I applied battery power to the car and ... no smoke. That is good!)

Saturday:
Saturday is a "honey-do" day. (By previous negotiations. lol) So, today we spent most of the day nailing up the wall covering (5/16" wafer board) on the remaining wall in Jacquie's glass workshop in the barn. It took twelve 4' x 8' panels ... most of which had to be cut to fit.
I'm "sorta hopeful" that the VW will be up and running by the end of next week ... sorta. A lot depends on what the meaning of "up and running" is!
Sunday is a R & R day.
2 comments:
"Up and running" means driving it into town for an ice cream cone!
Hope you make it.
I didn't mean for you to use the 'step stool' seat photo. It makes your little car look like the inside of a dump truck (not the cab, the inside of the truck).
Post a Comment